We installed waterproofing on the outside of the foam insulation panels at the locations that will be backfilled.  The green “Mel-Rol” is waterproofing.

IMG_8179

Next, Austin started on building the stem walls.  After these walls are poured, this area is backfilled with gravel and then the slab-on-grade is poured.

IMG_8225

Every 16″ on center is a rebar that has been drilled and epoxied into the concrete footings.